
SUNNYTIMES GT73 Electric Motorbike
Reliable shipping
Flexible returns
SPECIFICATIONS
Battery: Drawable dual battery
Battery Capacity: 18.2AH*2
Battery Position: Drawable dual battery
Braking System: Front & Rear oil brake+ Disc brake
Brand Name: Riding'times
Charging Time: 2 chargers: 9-10H
Controller: 52V 35A Integrated Controller
Display: 5 inch LED display
Frame Material: Carbon Steel
Gears: Other
Light: Angel Wings Ambient Light
Max Speed: 30-50Km/h
Model Number: GT73
Motor: 2000W Variable speed gear high torque motor
Motor position: Central Motor
Part: NFC card
Pedal Assist System: 5 Levels PAS
Place of Origin: Guangdong, China
Power Supply: Lithium Battery
Range per Power: 250km by PAS
Shock absorber travel: 18cm
Shock absorption: Off road front fork suspension
Suspension: Front hydraulic double wishbone suspension+Rear
Tire Width: 70/100-19 Off road tires
Torque: 106 Nm
Voltage: 48V
Wheel Size: 25 inch off-road tire(70/100-19)
Electrical machinery
|
2000W variable speed gear high torque motor
|
Tire specifications
|
70/100-19 off-road specific tires
|
Wheel rim
|
Off road rims
|
Damping
|
Off road front fork suspension (travel 18CM), rear hydraulic suspension
|
Torsion force
|
106Nm
|
Gradient
|
30°
|
Charging time
|
2 chargers: 9-10H
|
Instrument
|
5 inch LED display
|
Brake
|
Front & Rear oil brake+ Disc brake
|
Maximum speed
|
50KM/h
|
Vehicle weight
|
Approximately 39.5KG
|
Maximum load-bearing capacity
|
150KG
|











A:We are an Integration of industry and trade company.
Q: Do you accept OEM and ODM order?
A:Yes, We can do support OEM/ODM/OBM Service.
Q: Do you accept small batch orders?
A:Yes.We are happy to accept it. And we accept small batch mixed orders.
Q:How can we guarantee quality?
A:Always a pre-production sample before mass production;Always final Inspection before shipment.
Q:Why should you buy from us not from other suppliers?
A: We have many years of Electric scooter production and distribution experience, mature logistics network and terminal price control system. Can provide you with a stable and favorable supply and market competition environment.
Q: What`s the lead time?
A: 5 days for sample, 7 days for 50pcs, 15 days for 200pcs and 30 days for 500pcs after order confirmed.